In 
Service: 1 June 1929 to 15 June 1944  
 Ordered: Builder: Marinewerft 
Construction 
No: 113 
Laid down: 4 May 1927  
Launched: 15 March 1928 
Commissioned: 1 June 1929  
 Type: Torpedo boat 
Class: Predator  
Displacement: 
933 tons standard. 1,320 tons full load 
Length: 92.6 m 
Beam: 
8.6 m 
Draft: 3.52 m 
Propulsion: 2 × shaft geared steam 
turbines, 3 × boilers producing up to 25,500 shp 
Propellers: 
2 
Speed: 35.2 knots  
Range: 3,900 nautical miles at 17 knots 
 
Crew: 129 men and officers 
Armament: 3 × 10.5 
cm L/45 Tbts C/32
 carried 300 rounds
 4 × 3.7 cm L/83 SK C/30
 
carried 8000 rounds
 2 × 2 cm Flak L/65 C/39 before 1941
 4 × 
2 cm Flak L/65 C/39 after 1941
 carried 8000 rounds
 6 × 50 cm torpedo 
tubes before 1931
 6 × 53.3 cm torpedo tubes after 1931
 30 mines 
Armour Aircraft: Electronics:  Operators: 
Kriegsmarine 
Variants:   Other: Torpedo 
boats Articles:       1 June 1929 The torpedo boat Jaguar is commissioned. 
 
15 June 1944 The torpedo boat Jaguar is sunk along with Möwe, 
Falke, S-66, S-84 by the British RAF 16 crew lost. Position 49° 30N 00° 
07E.  
 
Hans-Armin 
Czech
 Takes command on 1 June 1929
 Ends command on 25 September 1931 
  

Gottfried 
Pönitz
 Takes command on 1 October 1932
 Ends command on October 
1933    

Friedrich 
Böhme
 Takes command on October 1933
 Ends command on September 
1935    

Karl 
Smidt
 Takes command on September 1935
 Ends command on March 1937  
  

Klaus 
Scholtz
 Takes command on June 1937
 Ends command on April 1939  
  

Franz 
Kohlauf
 Takes command on April 1939
 Ends command on October 1939  
  

Werner 
Hartenstein
 Takes command on October 1939
 Ends command on March 1941 
   

Friedrich-Karl 
Paul
 Takes command on March 1941
 Ends command on May 1942   
 

Hans 
Strecker
 Takes command on May 1942
 Ends command on June 1942  
  

Hanns 
Tietze
 Takes command on June 1942
 Ends command on August 1942  
  

Konrad 
Loerke
 Takes command on August 1942
 Ends command on September 1942 
   

Hans 
Strecker
 Takes command on September 1942
 Ends command on November 
1942    

Walter 
Lüdde-Neurath
 Takes command on November 1942
 Ends command on 
January 1943    

Horst 
Freiherr von Lüttitz
 Takes command on January 1943
 Ends command 
on February 1943    

Walter 
Lüdde-Neurath
 Takes command on February 1943
 Ends command on 
August 1943    

Horst 
Freiherr von Lüttitz
 Takes command on August 1943
 Ends command 
on September 1943    

Wirich 
von Gartzen
 Takes command on September 1943
 Ends command on October 
1943    

Otto 
Schäfer
 Takes command on November 1943
 Ends command on December 
1943    

Heinz-Harald 
Pockrandt
 Takes command on December 1943
 Ends command on January 1944 
   

Heinz-Jürgen 
Sonnenburg
 Takes command on January 1944
 Ends command on June 1944 
  
    German 
Warships, 1815-1945: Major Surface Vessels.
 ISBN-10: 0851775330 
 German 
Warships, 1815-1945: U-boats and Mine Warfare Vessels.
 ISBN-10: 155750301X 
 German warships of the Second World War.
 ISBN-10: 0668040378 
 
For a complete list of 
sources